Design and Inclusions
Prominda’s standard inclusions are available as a download. Our standard appliances all have maximum efficiency and energy ratings and are included in your contract price.
Site Transport and Installation
Construction will depend on the complexity of your build, but generally, the build time is 24 weeks from the start of construction of your home. We are not constrained by traditional building hurdles or site delays, meaning our homes are more likely to be delivered on time.
Energy Efficiency and Materials
Prominda has a philosophy of low impact on the environment. Using the Surefoot concrete-free footing system and/or Ezipier, both have minimal impact on the site as there is no clearing required. This minimises disruption to flora and fauna. As the modules are manufactured at our Yerong Creek facility and delivered, there is minimal disturbance on build site and the time required for installation can be as little as one week. To read more about sustainability at Prominda